Pinesul in Detail

So here’s Pinesul explained a little more. The prototype location featured a sulphur load out where empty gons were loaded with bulk sulphur and shipped south to other markets.

Prototype from North end:

48+Pinesul+Mile+641+7

As built on layout from North end:

Pinesul middle

The loading structure which I plan on kitbashing from some Walthers kits (the Glacier Gravel kit comes to mind)

Trip_North_July_2009_027

South end of Pinesul on the layout, the hoppers are spotted where the loading complex will be

Pinesul south complete

Overview with the south switch Pinesul at the bottom of the image. The track where the hoppers are spotted will have a car puller (winch) that allowed the loading staff to pull empties through the loader.

Pinesul south switch

Next up will be building the mainline to Kennedy!

Advertisement

1 thought on “Pinesul in Detail

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s