Today I finished framing part of the upper deck, as well as installing some 1/8″ Masonite back drops. The upper deck section shown in the photo will become the siding at Hulcross. I need a siding at this portion of the upper deck since it will take some time for trains to climb the helix, which creates the need for the siding on the upper level.