Today I installed the light switches and boxes for the layout lighting, as well as a couple of outlet boxes.
Switches 1 and 2 are for the upper deck lighting, 3 and 4 for the lower. The layout power will have it’s own switch.
And I cleaned up the power supply wires running to and from the boxes
The breakers for the lighting and power should be installed tomorrow, I managed to draw a bunch of curves on a sheet of 1/2″ plywood, and will start to cut them out sometime tomorrow.
Now, I really hope that Bendy Track shipment has made it to Canada!