Roof Work

It’s been far too long since my last post, ironically I’ve been busy working on the layout room and have had little time for a blog post!

So the drop ceiling is in place above Chetwynd Yard, and I have added extra room lighting as well as the lighting for the top deck:
IMG_0012

In the imag below you can see the lighting for the top deck, as well as the 1X2 support for the masonite valance, which I will add later.  IMG_0014

The image below shows the next section of ceiling that I am working on. I need to install a light and a heat vent before adding the rest of the tiles and the lighting for the top deck. Top deck lighting is a mix of 8 and 4 foot fluorescent lights with T8 bulbs

IMG_0013

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s